2026-11-17T07:05Z — Step 1

Necessary/useful instructions

  • implementation_standards.md "inspect existing implementations" and "replay that condition": the prod demo thread at 375 and 1280 pixels, the local check in 17 themes and the cycle 1 mock-up made the problem list concrete. The filled: 5 card traced to FilledDirective::isBare(). Retain.

  • RAILSPIKE.md Enhancement Requests ("changed scope … return to the earliest affected planning step"): gave the replan a place to be recorded. The unapproved pledge_stages Step 1 was dropped rather than revised, because the cycle's purpose changed. Retain.

  • RAILSPIKE.md effort study "retain paused, abandoned, replaced and incomplete cycles": kept v3/pledge_stages in the ledger with its snapshots, though its draft file was deleted. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • The /new or /clear reminder: there was discussion before this Step 1 (the pledge_stages Step 1), so the condition is met; given once.

Uncertain assessments

  • step1_solution_assessment.md "Original Query … do not summarize or omit anything": this cycle's query is the maintainer's replan message, kept word for word. The earlier pledge_stages request is summarized in one sentence as context, since it no longer defines the scope.

  • Deleting the unapproved pledge_stages Step 1 and its debug log: both were uncommitted drafts. The ledger keeps their snapshots and this log records the deletion; Railspike does not say whether an abandoned draft file must be kept.

  • Cycle number 9 keeps the checklist's numbers stable, as cycle 8 did.

  • .railspike_debug_on exists and the maintainer asked for debug mode; both give enabled. R1 hashes not re-verified.

2026-11-17T07:15Z — Step 1 (revision of the 07:05Z entry)

Necessary/useful instructions

  • step1_solution_assessment.md "Review and revision … Preserve the Original Query; record the revised direction separately. A request for changes does not approve the step": the maintainer's "option c, please" chose a direction but is not Approved Step 1, so Step 1 was revised and approval requested again. Retain.

  • RAILSPIKE.md "Append revisions and retain original scope/scores": the 0.50 projection stays beside the new 0.75 as scope v1 and v2. Retain.

  • implementation_standards.md "identify the canonical components": a quick read of the shared composer concept showed a placement with its own draft scope already exists (the calendar day page), so Option C is written as a placement, not a second form. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • Whether "option c, please" was meant as approval. The exact phrase is required, so it is treated as a revision; the maintainer may find the second request redundant.

2026-11-17T07:25Z — Step 2

Necessary/useful instructions

  • step2_feature_description.md Risks "earliest validation": checking the two-composer risk while writing Step 2 found the two real lookups (outbox_compose.js unsent replies, inline_reply_form.js Reply links) instead of leaving a vague risk for Step 3. Retain.

  • step2_feature_description.md "Known user or environment": the maintainer's iPhone SE is named, so the release check stays pending until he reports; headless Chrome at 375 pixels is recorded as not enough. Retain.

  • implementation_standards.md "identify all existing UI/API surfaces": listing the Reply page, Forte and the .txt view showed that hiding lines must stay on the thread page. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • RAILSPIKE.md "request approval in the format Approved Step N": the maintainer wrote "approved step 1" in lower case. Read as the required phrase; only the case differs.

  • Step 2 runs past one page because of the inventory and four risks; the warning sign says more than one page. Each section was cut to the items that decide Step 3.

2026-11-17T07:40Z — Step 3

Necessary/useful instructions

  • step3_development_plan_do.md "Resolve each material risk before dependent work": reading inline_reply_form.js, outbox_compose.js, browser_signing.js and ComposeAndAccountKeyController settled the two-composer risk down to one lookup before planning Stage 4. Retain.

  • step3_development_plan_do.md "a stage that replays each reported failure": Stage 5 replays the demo thread at the iPhone SE's size and keeps the device check pending. Retain.

  • RAILSPIKE.md "Keep work within … eight Step 3 stages": met; Step 1's own five-stage limit for keeping the form was the tighter bound, and merging the fold into Stage 2 kept it. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • "Stages should be about ≤1 hour or ≤50 lines": Stage 4 (the pledge form and its browser checks) may run past 50 lines in the browser test alone. Kept whole, since splitting the form from its checks would leave a stage with an unverified control.

  • The writing style's "code never appears" against Step 3's "include planned function signatures": one signature, PledgeLines::hide(), is named.

2026-11-17T08:45Z — Step 4

Necessary/useful instructions

  • implementation_standards.md "replay that condition or explicitly report it unverified": the demo thread was replayed locally at the iPhone SE's 375 by 667 pixels, with and without JavaScript, and the device check stays pending. Retain.

  • step4_implementation_do.md stage boundary protocol: committing each stage with its summary kept four in-scope refinements (bar colours, blank lines, the unreadable reason, Options) recorded beside the stage that found them. Retain.

  • implementation_standards.md "check affected shared consumers": the second composer touched the Outbox list, Reply links and drafts; each got a browser check in Stage 4. Retain.

  • RAILSPIKE.md effort ledger rules: the entry snapshot went in with Stage 1, not the planning commit. Retain.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • Documentation-only rules: the work type is an application change.

  • Follow-up cycles before merge: a new branch from origin/main, not a reused one.

Uncertain assessments

  • The planning commit also carried the checklist and spec edits that record the replan, as cycle 8's did with the checklist. RAILSPIKE.md allows "moves, index entries and reference fixes"; these record approved scope, not organization, so they sit at the edge of that allowance.

  • Step 2 and 3 named a thread .txt view that does not exist. Recorded as a correction in Stage 2, not a scope change, since the intent (other views keep every line) held.

  • Screenshots were looked at by the agent; no independent visual review was run.