Repository source: docs/plans/nav_tree/nav_tree_debug_log.md
nav_tree Railspike debug log
2026-11-15T02:44:42Z — Step 1
Debug mode: enabled (project default: .railspike_debug_on present at the v3 root; no explicit request).
Necessary/useful instructions
RAILSPIKE.md, Step Guide and the Step 1 structure instep1_solution_assessment.md(preserve the Original Query, then Understood Intent). The query arrived across four chat messages; keeping all four verbatim kept the device-only and page-change decisions traceable. Retain.RAILSPIKE.md, Enhancement Requests. The maintainer asked to "make a note" of syncing and in-page changes. The rule gave those notes a home in the artifact rather than only in chat. Retain.AGENTS.md(host), "decide viewer-specific UI in the client before paint". This framed the History page as client-rendered from device state. Retain.step1_solution_assessment.md, "vertical-slice viability". It exposed that a capture-only cycle would not be releasable, which moved a plain History page into this cycle. Retain.
Redundant/unnecessary instructions
RAILSPIKE.md, Experimental Effort Estimation. The rules for reference recovery, worktree deduplication and outcome counting take up much of the file, yet only the snapshot fields applied to a Step 1 handoff. Suggest moving the non-Step-1 parts behind a link, as the debug section partly does already.
Inapplicable instructions
Follow-up Cycles Before Merge, Documentation-only scope, and Step 4 commit cadence. They do not apply to a Step 1 draft.
Uncertain assessments
Step 1 file location.
RAILSPIKE.mdsays to organize plans intodocs/plans/{feature_name}/only after Approved Step 3, but most recent v3 cycles create the folder at Step 1. This draft follows the written rule (flat file). A one-line clarification of which convention is intended would help."Concepts touched" for a proposed concept with no entry. The concept guidance was not reopened, so it is unclear whether visit tree needs an inventory entry now or at Step 4.
2026-11-24T17:55Z — Step 1 (revision)
Revision of the 2026-11-15T02:44:42Z entry's step: the draft was rechecked against main 2d7805c. Debug mode: enabled (inherited from the Step 1 artifact).
Necessary/useful instructions
RAILSPIKE.md, Instruction Summaries, "On resumption, reread applicable instructions and restore workflow state". Rereading the draft's state fields exposed a stale host-ledger link. Retain.step1_solution_assessment.md, "Re-estimate combined/revised options with stable identities and append scope/score changes". It kept Options A–C under their letters with both scores visible. Retain.RAILSPIKE.md, Agent attribution, "Preserve prior attribution when revising". Each revised option keeps its 2026-11-15 line and gains a revised line. Retain.Host
AGENTS.md, Continuing Railspike effort study: "do not append toeffort_estimation_trial.md". The request named that file; this rule redirected the entry toeffort_ledger/nav_tree.md. Retain.
Redundant/unnecessary instructions
No supported findings.
Inapplicable instructions
The /new or /clear reminder in
step1_solution_assessment.md, Next. It is once per cycle and does not repeat on revisions.
Uncertain assessments
Scope versioning when only understanding changes. The rules say to "distinguish new understanding from changed scope" but give no label for it. This revision used "scope v2 (new understanding, same outcome)"; a fixed label would help.
Planning branches.
RAILSPIKE.mdkeeps Steps 1–3 uncommitted, yet this cycle keeps its draft on an unmerged planning branch to survive a new session. The workflow says nothing about such branches.
2026-11-25T07:10Z — Step 2
Debug mode: enabled (inherited from the Step 1 artifact).
Necessary/useful instructions
step2_feature_description.md, Structure, "Shared component inventory … inspect and enumerate existing UI/API surfaces". Inspecting Tools found the Usage Log page and the Tools "device" group, which set History's layout and place. Retain.step2_feature_description.md, Guardrails, "Surface material risks; do not bury them". The Safari seven-day storage wipe and the restored-pane duplicate became explicit risks. Retain.implementation_standards.md, "Define completion through ordinary UI/CLI entry … required failure/retry recovery". It produced the storage-failure recovery line, which the draft lacked. Retain.
Redundant/unnecessary instructions
step2_feature_description.md, "Known user or environment". No user or environment was named, so the item was omitted; the instruction already says so. No supported findings beyond that.
Inapplicable instructions
Documentation-only scope rules: this is an application change.
Uncertain assessments
Step 1 left several choices "decided in Step 2" without the maintainer present. The step has no section for proposed decisions, so this artifact added "Proposed decisions for confirmation". A named place for them would help.
2026-11-25T07:25Z — Step 3
Debug mode: enabled (inherited from the Step 2 artifact). Approval arrived as "Approved. Step 2." rather than the exact "Approved Step 2"; it was read as approval of Step 2.
Necessary/useful instructions
step3_development_plan_do.md, "Prefix usability, data, or rollback risks High risk:". It singled out the Beside duplicate-visit risk, which would show on every main page. Retain.step3_development_plan_do.md, "Canonical components/API contracts as an explicit bullet". Each stage names the precedent it copies (nav slots, usage log page, open beside), which keeps Step 4 from inventing new patterns. Retain.Host
AGENTS.md, Navigation icons. It turned "a Tools entry" into its own stage withNavIconSetsTest, which would otherwise be missed. Retain.
Redundant/unnecessary instructions
step3_development_plan_do.md, "Include planned function signatures when relevant, without code" next to "Avoid full code". The two overlap; one sentence would do.
Inapplicable instructions
"When Step 2 states a known user or environment recovery condition, include a stage that replays each reported failure". Step 2 names none.
Uncertain assessments
Exact approval phrase.
RAILSPIKE.mdasks for "Approved Step N" exactly, but says nothing about near matches such as "Approved. Step 2." This step treated it as approval and said so in the handoff.Stage sizing at about 50 lines. Stage 2 may run past 50 lines of change; it was kept whole because splitting load capture from back and forward would leave an untestable half.
2026-11-25T09:35Z — Step 4
Debug mode: enabled (inherited from the Step 3 artifact). Seven stages on feat/nav-tree, planning commit f585d60, stage commits 65ebdbe to 9aa0b06.
Necessary/useful instructions
step4_implementation_before.md, Planning Docs Commit Gate. Moving the approved plans from the planning branch intodocs/plans/nav_tree/before any code kept the planning commit clean; the ledger and checklist went with Stage 1, as the gate requires. Retain.step3_development_plan_do.mdandRAILSPIKE.md, "Resolve each material risk before dependent work". Stage 1's probe answered thesessionStoragequestion in all three engines before any recorder code, and dropped an unneeded mitigation. Retain.implementation_standards.md, "Check affected shared consumers … themes". It led to runningtools_launcher.mjsandToolsRegistryTest, which caught the registry count and the launcher's flag list. Retain.Host
AGENTS.md, Navigation icons, "Verify the icon in each affected theme … text-only theme checks do not cover this". The screenshots also exposed the History page's unclear branches, fixed in Stage 6. Retain.step4_implementation_do.md, Stage Boundary Protocol. One commit per stage with its summary update kept each discovery (Firefox reload, Forte layout) next to the change it caused. Retain.
Redundant/unnecessary instructions
step4_implementation_do.md, extended-estimate paragraphs on split, blocked and replaced stages. No stage was split or blocked; the paragraphs were read and not used. Suggest folding them behind a link, as the debug section does.
Inapplicable instructions
Documentation-only scope rules, Follow-up Cycles Before Merge, and the known-user replay stage: none apply to this cycle.
Uncertain assessments
Step 3 named
BrowserRuntimeProfile.phpfor key names andopen_beside.mjsfor the Beside tests; Step 4 followed closer precedents instead and recorded why. The workflow has no field for "followed a different canonical component than planned"; the stage notes carried it.tests/browser/offline tests run only in Chromium. The Completion Contract asked for three engines without naming offline; the summary reports offline in Chromium only rather than claiming all three.Push and PR. Step 4 ends at handoff; the branch was pushed so the work survives the session, but no PR was opened without a request.