Repository source: docs/plans/effort_ledger/quill_rename.md
Cycle v3/quill_rename
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/quill_rename | One-shot technically complete; production replay pending | v1 / R1 / P2 | 0.30 (intake and retrospective) | record | No parent; maintainer fit judgment pending |
2026-11-16T10:40Z — Standing P2 enrollment. Ships before v3/agent_checkin Step 4. Intake 0.30 after source inspection (no pristine intake), retrospective 0.30, single exposed Claude rater. Baseline c98b522. No accepted-count change.