Repository source: docs/plans/effort_ledger/push_on_events.md
Cycle v3/push_on_events
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/push_on_events | Step 4 complete; merge, deploy and iPhone replay pending | v1 / R1 / P2 | 0.70; retrospective 0.75 | Step 1, Step 2, Step 3, Step 4 | Notifications checklist cycle 4; follows v3/push_subscribe (cycle 3 push_ios_guide skipped for now) |
2026-11-24 UTC — Standing P2 enrollment. Inherited checklist estimate 0.60. Intake after reading the write paths, read state and task queue (no pristine intake), single exposed Claude rater. Step 1 alternatives A 0.70, B 0.55, C 0.75 (not summed); recommended A 0.70. Baseline 6b66069d.
2026-11-24 UTC — Step 1 approved (Option A; open-question assumptions carried forward). Step 2 handoff 0.70, unchanged (new understanding: DM hook in the mailbox service, shared device check). Same rater and baseline.
2026-11-24 UTC — Step 2 approved. Step 3 handoff 0.70, unchanged; five stages (stage work 0.20, 0.15, 0.08, 0.15, 0.07, not summed). Same rater and baseline.
2026-11-24 UTC — Step 3 approved. Step 4 entry: 0.70 reaffirmed. Planning commit bebea6e.
2026-11-24 UTC — Step 4 closeout: five stages committed (stage retrospectives 0.20, 0.15, 0.08, 0.15, 0.07, not summed). Cycle retrospective 0.75 (projected 0.70): the approved-key device rule and the worker's site address. Maintainer judgment and the iPhone replay pending.