Repository source: docs/plans/effort_ledger/publish_local_public_keys.md
Cycle v3/publish_local_public_keys
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
| v3/publish_local_public_keys | Step 4 all stages locally complete; acceptance pending | v1/A / R1 / P2 | 0.65 | Intake/Step 1; Step 2; Step 3 | Related accepted feedback PF-20261121-F03/F11; acceptance pending |
2026-11-22T21:04:12+00:00: Intake 0.50, Codex single exposed rater, scope v1, baseline 22fc9f10a4d4f8cba9ecaed501aba2ea90d129e4. Standing enrollment; R1 hashes verified. Prior import/API review disclosed; no independent or measured-effort claim. Planning remains uncommitted.
2026-11-22T21:06:22+00:00: Step 1 handoff 0.50 reaffirmed for Option A; Option B 0.90, non-additive. Source review finds existing unsigned public-key registration; current naming/retirement restrictions retained. Same v1/R1/P2, single exposed Codex rater. Intake snapshot preserved in the assessment. Awaiting Approved Step 1; no acceptance increment.
2026-11-22T21:13:08+00:00: Maintainer approved Step 1 Option A ("approved step 1"). Step 2 handoff 0.50 reaffirmed, scope v1/A, baseline 22fc9f10a4d4f8cba9ecaed501aba2ea90d129e4, R1/P2. Same exposed Codex rater, hashes reverified. Public-only source, preview/selection binding, no name/retirement changes, read-back and partial retry retained. Awaiting Approved Step 2; planning uncommitted; no accepted outcome increment.
2026-11-22T21:44:51+00:00: Maintainer approved Step 2 with "approved step 2". Step 3 handoff projection 0.65 (prior 0.50 preserved), same v1/A scope, R1/P2 and exposed Codex rater. New understanding: strict secret-packet exclusion, binding reviewed source bytes/destination and fault verification. Four stage-work estimates 0.18, 0.22, 0.15, 0.08 are supplemental and not summed. All R1 hashes verified. Awaiting Approved Step 3; no implementation/branch/commit or accepted outcome increment.
2026-11-22T22:48:00+00:00: Step 3 approved. Fresh-main baseline 8b00a78be, planning commit 68e4c4269; Step 4 entry 0.65 reaffirmed. Stage 1 original 0.18, retrospective 0.20; focused checks passed with retained smoke baseline failures. No scope change, measured labor or acceptance increment. Canonical progress: ../publish_local_public_keys/publish_local_public_keys_step4_implementation_summary.md.
2026-11-22: Stage 2 locally complete; original stage work 0.22, retrospective 0.25. Cycle projection 0.65 reaffirmed, same v1/A/R1/P2 and exposed rater. Focused publication/recovery checks pass; known smoke failures retained. No measured labor or production acceptance increment.
2026-11-22: Stage 3 locally complete; original 0.15, retrospective 0.17. Actual isolated API/CLI acceptance and selected shared consumers pass; four baseline smoke failures remain. Same v1/A/R1/P2/exposed rater, projection 0.65 unchanged. No production acceptance or measured labor.
2026-11-22: Stage 4 original 0.08, retrospective 0.08; docs/index/help checks passed after correcting the launcher comment. Four planned stages complete. Independent retrospective cycle scope assessment 0.75 (planning/inspection and integrated recovery evidence included), prior 0.50/0.65 preserved. Same v1/A/R1/P2 and exposed Codex rater; hashes reverified. Baseline 8b00a78be; planning 68e4c4269, preview 78da8c12c, publication 3304d9083, acceptance f3d24dd33; final documentation revision is this entry's commit. Stage 3 smoke 505/501 with four reproduced baseline failures; focused API 5/5 and script index 3/3 pass. Full suite not run. Production, maintainer comfortable-fit judgment and acceptance date pending; measured active work unknown. No study acceptance increment; worktree copies are not independent outcomes. Final summary links all evidence and next action.