Cycle v3/pledge_stages

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/pledge_stagesAbandoned before Step 1 approval; replaced by v3/pledge_frontendv1 / R1 / P20.45 (intake 0.45; Step 1 0.45)Step 1 draft dropped unapproved and uncommitted; snapshots kept in this entryParent v3/pledge_fill_review; no outcome

2026-11-17T07:05Z: abandoned. The maintainer asked to prioritize the frontend and cut unnecessary features before approving Step 1. Stages, cushion, markers and the celebration were cut; the status word moved to v3/pledge_frontend. Incomplete outcome retained; not counted as an accepted observation.

2026-11-17T06:45Z: standing P2 enrollment for pledge stages, staged. Intake 0.45 for Option B (stages, cushion and celebration now; markers in a new cycle 9) with celebration approach 2, after reading PledgeCampaign, pledge_totals.php, the thread page loop and the deploy celebration; no pristine intake. Step 1 handoff 0.45; option estimates A 0.75, B 0.45, celebration approaches 0.40, 0.45, 0.45, not summed. Baseline fc368349. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.