Repository source: docs/plans/effort_ledger/pledge_frontend.md
Cycle v3/pledge_frontend
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/pledge_frontend | Technically complete; release check and maintainer acceptance pending (every step approved by the maintainer) (every step approved by the maintainer) | v2 / R1 / P2 | 0.75 (intake 0.50; Step 1 0.50; Step 1 revision 0.75; Step 2 0.75; Step 3 0.75; entry 0.75; retrospective 0.70) | Intake and Step 1; Step 2; Step 3; Step 4 | Parent v3/pledge_fill_review; replaces v3/pledge_stages; cycle 9 in pledges checklist (source unavailable); acceptance pending |
2026-11-17T08:40Z: Step 4 closeout for v3/pledge_frontend: five stages complete on feat/pledge-frontend from f381052a (planning commit f0657102). Entry projection 0.75 reaffirmed; no revisions. Retrospective scope assessment 0.70; stage retrospectives 0.14, 0.12, 0.08, 0.18, 0.08, not summed. Release check on zenmemes.com from the maintainer's iPhone SE pending. Maintainer comfortable-fit judgment pending. Same R1/P2, single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified.
2026-11-17T07:55Z: Step 4 entry for v3/pledge_frontend: Step 3 approved by the maintainer; planning commit f0657102 on feat/pledge-frontend from f381052a. Entry projection 0.75 reaffirmed. Summary.
2026-11-17T07:40Z: Step 3 handoff for v3/pledge_frontend: 0.75 reaffirmed, scope v2. Step 2 approved by the maintainer. Stage work 0.14, 0.14, 0.10, 0.20, 0.08, not summed. Baseline fc368349. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.
2026-11-17T07:25Z: Step 2 handoff for v3/pledge_frontend: 0.75 reaffirmed, scope v2. Step 1 approved by the maintainer (Option C). Baseline fc368349, R1/P2. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.
2026-11-17T07:15Z: Step 1 revision for v3/pledge_frontend: the maintainer chose Option C. Projection 0.75, scope v2 (Option B plus a pledge form in the totals block, as a shared-composer placement; the "Add a pledge" link dropped). Changed scope, not new understanding; v1 and its 0.50 retained. Same rater and exposure. No implementation.
2026-11-17T07:05Z: standing P2 enrollment for pledge frontend, staged. Intake 0.50 for Option B (restyle, hide read lines, fold every action reply that took effect, a status word, an "Add a pledge" link), after reading the thread page, the pledge partials, the fold, the prod demo thread, the local 17-theme check and the cycle 1 mock-up; no pristine intake. Step 1 handoff 0.50; option estimates A 0.30, B 0.50, C 0.75, not summed. Baseline fc368349. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.