Repository source: docs/plans/effort_ledger/pledge_cards.md
Cycle v3/pledge_cards
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/pledge_cards | Technically complete; release check and maintainer acceptance pending (every step approved by the maintainer) | v4 / R1 / P2 | 0.65 (intake 0.45; Step 1 0.45; revision 1 0.45; revision 2 0.50; revision 3 0.60; revision 4 0.65; Step 2 0.65; Step 3 0.65; entry 0.65; retrospective 0.70) | Intake and Step 1; Step 2; Step 3; Step 4 | Parent v3/pledge_frontend; cycle 10 in pledges checklist; acceptance pending |
2026-11-17T20:10Z: Correction after closeout: approval now clears baked pages of threads the approved person posted in (maintainer report of stale "Waiting for approval" rows). Defect in this cycle's own promise; no new scope; projection and retrospective 0.70 unchanged.
2026-11-17T19:00Z: Step 4 closeout: four stages complete on feat/pledge-cards from 6e82449d (planning commit 2752eebb). Entry projection 0.65 reaffirmed; no revisions. Retrospective scope assessment 0.70; stage retrospectives 0.22, 0.22, 0.16, 0.10, not summed. Release check from the maintainer's iPhone SE and the "claude" key's approval on zenmemes.com pending. Maintainer comfortable-fit judgment pending. Same R1/P2, single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified.
2026-11-17T18:30Z: Step 4 entry: Step 3 approved by the maintainer; planning commit 2752eebb on feat/pledge-cards from 6e82449d. Entry projection 0.65 reaffirmed.
2026-11-17T18:20Z: Step 3 handoff: 0.65 reaffirmed, scope v4. Step 2 approved by the maintainer. Stage work 0.18, 0.20, 0.17, 0.10, not summed. Baseline 6e82449d. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.
2026-11-17T18:10Z: Step 2 handoff: 0.65 reaffirmed, scope v4. Step 1 approved by the maintainer (Option A). Baseline 6e82449d. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.
2026-11-17T18:00Z: Step 1 revision 4, rewritten clean. The maintainer chose a "Waiting for approval" row for unapproved pledges (+0.05); projection 0.65, scope v4. Options in the clean version: A (rows) 0.65, B (cards with "More") 0.45, C (site-wide) 1.00, not summed. Earlier versions retained here. No implementation.
2026-11-17T17:55Z: Step 1 revision 3. The maintainer asked that only approved users' pledges appear, to cut complexity. Approved-only rule and removal of FORUM_PLEDGES_COUNT_UNNAMED_ENABLED added (+0.10); projection 0.60, scope v3. v1 and v2 retained. No implementation.
2026-11-17T17:50Z: Step 1 revision 2. The maintainer asked to collapse each pledge to the bare minimum. Option F (one row per pledge, joined into a list, opening to the full pledge) 0.50 added and recommended; projection 0.50, scope v2. v1 and its 0.45 retained. No implementation.
2026-11-17T17:40Z: Step 1 revision 1. The maintainer asked to hide the less relevant buttons until a card is opened. Options D (hidden behind "More", a pending review stays out) 0.45 and E (tap the card) 0.60 added; recommendation B → D; projection 0.45 reaffirmed. Base now origin/main at 964966c1 (PR #313 merged). No implementation.
2026-11-17T09:20Z: standing P2 enrollment for pledge cards, staged. Intake 0.45 for Option B (compact header, one action row, a "…" menu on pledge cards), after rendering the thread at 375 pixels, reading post_card.php and the pledge partials, and mocking Option B in the browser; no pristine intake. Step 1 handoff 0.45; option estimates A 0.30, B 0.45, C 0.90, not summed. Baseline feat/pledge-frontend at b7e99459. Single exposed rater Claude (claude-opus-5-5); R1 hashes not re-verified. No implementation.