Cycle v3/nav_tree

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/nav_treeStep 4 complete 2026-11-25 on feat/nav-tree; review, merge and deployment pendingv2 / R1 / P20.70 (retrospective 0.72)Step 1, Step 2, Step 3, Step 4Item 1 of the browsing tree checklist (v3/browsing_tree_checklist); no parent cycle; comfortable-fit judgment pending maintainer

2026-11-15T02:44:42Z — v3/nav_tree Step 1 intake and handoff (standing P2 enrollment): projection 0.55 for Option B, scope v1, starting revision 8bec1f7d. Not pristine (after reading the service worker, usage log, navigation slots and paned readers). Alternatives A 0.45, C 0.75. Single exposed Claude rater. Recorded here on 2026-11-24; it was in the draft only.

2026-11-24T17:55Z — Step 1 handoff revision: projection 0.65 for Option B, scope v2 (new understanding, same outcome), starting revision 2d7805c8. Reason: open beside, more pushState readers, replaceState and tour frames. Alternatives A 0.50, C 0.85. Single exposed Claude rater who saw the v1 scores.

2026-11-25T07:10Z — Step 2 handoff: projection 0.65 reaffirmed for Option B, scope v2, starting revision 2d7805c8. Single exposed Claude rater.

2026-11-25T07:25Z — Step 3 handoff: projection 0.70 (from 0.65): three-engine acceptance, pre-paint tree, tour frame check. Seven stages, not summed. Single exposed Claude rater.

2026-11-25T07:45Z — Step 4 entry after planning commit f585d60: 0.70 reaffirmed. Single exposed Claude rater.

2026-11-25T09:30Z — Step 4 closeout: delivered scope v2 with two in-scope refinements (Forte pages, branch bars); seven stage commits; retrospective 0.72. Maintainer fit and acceptance pending.