Repository source: docs/plans/effort_ledger/image_loading.md
Cycle v3/image_loading
| Stable cycle ID | Status | Scope / reference / protocol | Projected total | Canonical checkpoints | Parent / acceptance |
|---|---|---|---|---|---|
v3/image_loading | Step 4 complete; review and production checks pending | v1 / R1 / P2 | 0.90 (Steps 1–4; Step 1 revised from 0.80); retrospective 0.95 | Step 1, Step 2, Step 3, Step 4 | Follows v3/zen_hero; maintainer judgment pending |
2026-11-22 — Step 1. Intake and handoff 0.80 for Option A (B 0.45, C 1.10; alternatives, not summed). Single exposed Claude rater. Measured time unknown.
2026-11-22 — Step 1 revision after the maintainer's answers: Option A 0.90 (was 0.80); scope adds site-wide display copies and one retry.
2026-11-22 — Step 1 approved (Option A as revised). Step 2 handoff 0.90, reaffirmed. Single exposed Claude rater.
2026-11-22 — Step 2 approved. Step 3 handoff 0.90, reaffirmed. Stage work: 0.10, 0.20, 0.15, 0.10, 0.30, 0.05 (not summed).
2026-11-22 — Step 3 approved. Step 4 entry 0.90; retrospective scope assessment 0.95. Stage retrospectives: 0.10, 0.25, 0.15, 0.10, 0.30, 0.05. Maintainer judgment pending. Measured time unknown.