Cycle v3/deploy_rollback

Stable cycle IDStatusScope / reference / protocolProjected totalCanonical checkpointsParent / acceptance
v3/deploy_rollbackStep 4 complete; production acceptance pendingv1 / R1 / P20.65; retrospective 0.70Step 1, Step 2, Step 3, Step 4No parent; related to v3/web_deploy, v3/deploy_header_prompt

2026-11-20T17:30Z — Standing P2 enrollment. Intake after code inspection (no pristine intake), single exposed Claude rater. Step 1 alternatives A 0.60, B 0.65, C 1.40 (not summed); recommended A 0.60. Baseline eb0f5177.

2026-11-20T18:30Z — Step 1 approved (Option A). Step 2 handoff 0.65 (new understanding: history seeded from the old log; positional inserts in two side stores). Same rater and baseline.

2026-11-22 UTC — Step 2 approved. Step 3 handoff 0.65, unchanged; five stages (stage work 0.10, 0.20, 0.10, 0.20, 0.05, not summed). Baseline moved to d9e9a91a.

2026-11-22 UTC — Step 3 approved. Step 4 entry: 0.65 reaffirmed. Baseline 57e7b934.

2026-11-22 UTC — Step 4 closeout: five stages committed. Cycle retrospective 0.70 (projected 0.65). Maintainer judgment and the production replay pending.