backlog_view Railspike debug log

2026-11-23T05:15Z — Step 1

Necessary/useful instructions

  • step1_solution_assessment.md, Understood Intent: "start work" has several readings. Naming the chosen reading, and making it the first open question, kept the options from resting on a silent guess.

  • AGENTS.md (host), search docs/feedback/items/ before starting: this led to the parked work page plan and the 2026-11-04 removal, which shaped Option C's main con.

  • step1_solution_assessment.md, extended estimates per option with driver and uncertainty: the gap between B and C is the claim's storage, which the estimate lines make visible.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • step1_solution_assessment.md, the /new or /clear reminder applies: discussion preceded this Step 1. It is included once in the handoff.

Uncertain assessments

  • The counts (285 untriaged, 342 items citing a site post, 30 parked Step 1 plans) come from quick shell counts at 8a5aa40, not from ./v3 feedback check.

  • The tag counts (#todo 29, #issue 7) were read from zenmemes.com/tags/ on 2026-11-22 and may have moved.

  • The ≤1 page limit is exceeded; the "what exists" facts seemed needed to judge the options.

2026-11-23T05:30Z — Step 1, Revision (adds to the 05:15Z entry)

Necessary/useful instructions

  • step1_solution_assessment.md, Review and revision: the refinement is recorded under Revised Direction in the maintainer's words, and the Original Query is untouched.

  • effort-estimation, stable option identities: v1 Options A to C keep their letters and figures; the revised options are D to F.

  • thread_to_pr.md (host), approach risk "more work than one bounded cycle": this led to the three-cycle Option E.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • "parked plans separately" is read as a separate list, built in a separate cycle. It could mean only one of those.

  • The projections for the two later cycles (0.40, 0.15) are rough and belong to their own Step 1s.

2026-11-23T05:40Z — Step 1, Revision 2 (adds to the 05:30Z entry)

Necessary/useful instructions

  • effort-estimation, append scope and score changes: the shorter prompt removed work, so the lower figures are recorded beside the earlier ones.

Redundant/unnecessary instructions

  • No supported findings.

Uncertain assessments

  • A short prompt moves the reading cost into the item files. Whether thin untriaged items are enough for an agent is untested; it is an open question in the artifact.

2026-11-23T05:45Z — Step 2

Necessary/useful instructions

  • step2_feature_description.md, Known user or environment: the maintainer's iPhone SE set the 375 px check and the Copy fallback.

  • implementation_standards.md, inspect existing implementations: found agent_prompt.php with Copy and the board_sort.php sort links, so neither is planned as new.

  • step2_feature_description.md, Risks with earliest validation: put "run Salient over the real items" before any markup.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • Documentation-only scope fields.

Uncertain assessments

  • The mockup is treated as accepted because Step 1 was approved after it with no comment. The maintainer did not say so.

  • The Salient rule and the address words are the agent's proposals.

  • The ≤1 page limit is exceeded.

2026-11-23T05:55Z — Step 3

Necessary/useful instructions

  • step3_development_plan_do.md, a stage that replays the known user's condition: Stage 6 carries the 375 px check and one real start, and leaves the maintainer's own phone start pending instead of claiming it.

  • step3_development_plan_do.md, resolve each material risk before dependent work: the Salient run sits in Stage 1, ahead of the page.

  • AGENTS.md (host), Navigation icons: the Tools entry's icons are named in Stage 3 with NavIconSetsTest.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • Database change notes: nothing is stored.

Uncertain assessments

  • Stage 3 at 0.18 may exceed the "about one hour or 50 lines" guide; it was kept whole because a list without its Tools entry and flag is not reachable.

  • ApiTextController.php and ApiRouteCatalog.php are named from their file names, not from reading them.

  • The ≤1 page limit is exceeded.

2026-11-23T07:10Z — Step 4

Necessary/useful instructions

  • step4_implementation_before.md, Planning Docs Commit Gate: the plans were moved and committed alone as 1235b66 before any code, so each later commit is one stage.

  • implementation_standards.md, inspect existing implementations: found the hidden-tools rule in TemplateRenderer.php after a first attempt filtered in two templates. The first attempt was dropped for the existing rule.

  • implementation_standards.md, unverified required checks stay pending: the real agent start and the maintainer's phone start are recorded as pending, not passed.

  • AGENTS.md (host), Navigation icons, with NavIconSetsTest: the three icon sets and the shared sizing rule were updated together.

  • Host rule on tests that fail on the base commit: tests/browser/tools_launcher.mjs failed on origin/main at the Zalgo theme and was fixed in Stage 3.

Redundant/unnecessary instructions

  • No supported findings.

Inapplicable instructions

  • Documentation-only stage checks; database change notes.

Uncertain assessments

  • A helper script in Stage 1 stopped on an assertion before it wrote the checklist ticks and the ledger line. They were written in Stage 2's commit, so the Stage 1 commit shows the checklist one step behind.

  • Step 3 named ApiTextController.php and board_sort.php without reading them. Both turned out not to fit. Reading the named files during Step 3 would have avoided two recorded deviations.

  • The plan's real-start check asks for a second agent session. Whether a planning approval covers starting one was unclear, so it was left pending.

  • The Step 3 after-phase file (step3_development_plan_after.md) was not read before the Step 3 handoff.