Backlog checklist

Tracks the three backlog cycles. Update it when a step is approved, a PR opens or merges, or the maintainer accepts a cycle. Plans: backlog_view Step 1, Step 2, Step 3, Step 4. Mockup: https://claude.ai/artifact/3TP5kpHR5jL27mSZjCqmmn

Goal: one page of things to work on, sortable, where the maintainer or an agent starts one item or several, without duplicate work.

Cycle 1 — backlog_view (staged; estimate 0.60)

The page, the sorts, the filters, Start with a short prompt, and the agent interface.

  • Follow-up one-shot backlog_start_followups (record), from his first look:

  • Follow-up one-shot backlog_prompt_access (record), from his notes while starting two items:

  • Seen live, no change asked: the five lines of link rows at 375 px, Salient not putting ready items first, Effort and Impact sorting one way. Also seen, 2026-11-23: /backlog/start.txt is served with a two-day Cache-Control: max-age, so a browser can show a prompt from before a deploy.

Cycle 2 — backlog_claims (staged; estimate 0.45, first rough figure 0.40)

Start claims the items, so the page and other agents see who holds them. Plans: Step 1, Step 2, Step 3, Step 4. Concept: work claim. Feedback: PF-20261123-F02.

  • Seen while building, no change made: "Hide claimed" puts the link rows on a sixth line at 375 px; a browser key with no chosen name is labelled "guest", close to the wording for a claim with no name; Recent still lists every claim.

Cycle 3 — backlog_parked (one-shot unless it grows; rough estimate 0.15)

The plans in docs/plans/backlog/ as their own list.

Later, not planned

  • Asked 2026-11-24, not started: a close button for items that are already done, and what to do about the backlog holding many finished items. Counted that day: 282 untriaged, 3 ready, 66 blocked (62 of them built and locally-verified, waiting to be accepted), 6 done; 17 of the untriaged or ready items mention a pull request or merge in their notes.

  • Fill in Estimate and Impact across items (22 have an estimate, none an impact) so the sorts mean something. A triage task.

  • Change an item's effort, impact or workflow from the page.

  • A list fresher than the last deploy.

  • Start for agents with no shell.

  • A navigation bar entry, if Tools proves too far away.

Decisions so far

  • Feedback items are the only source; site threads enter through triage. (2026-11-23)

  • Anyone can read the page; it lives under Tools for now. (2026-11-23)

  • Five sorts, with triage as a filter. (2026-11-23)

  • Impact uses the same decimal scale as Estimate. (2026-11-23)

  • The prompt is short, assumes the agent has the repository, names files to read, and tells the agent to go to a PR. (2026-11-23)

  • The prompt says please. The agent picks one-shot or staged unless Start names one. (2026-11-23)

  • Several picked items become one cycle. (2026-11-23)

  • The prompt asks for a clone and a pull request, never patch files; an agent without access stops and says what to connect. (2026-11-23)

  • An agent given several items says so before building when they do not belong in one pull request. (2026-11-23)

  • A claim is a claim: line in a signed reply in the site's claims thread, read when the backlog is shown; nothing else is stored. (2026-11-23)

  • Start warns about a held item and never refuses. Only approved keys' claims count; guest claims are shown. (2026-11-23)

  • A site with no claims thread named behaves exactly as before claims existed. (2026-11-23)

  • Start means prompt plus claim; the claim arrives in cycle 2. (2026-11-23)

  • Parked plans are shown separately. (2026-11-23)