ID: PF-20261117-F01
Title: Useful local first page and browser import
Kind: feature
Workflow: blocked
Created: 2026-11-17
Evidence: deployed

Request:
After git clone and ./v3 start, the first browser page should offer something useful to explore and a 1–3-click path to import production content. Build an MVP.

Sources:
- http://127.0.0.1:8000/threads/thread-20261116191346-32ffe183

Done when:
A fresh local launch offers exploration and public-content import. Imported threads open through ordinary pages. Download failures support retry; interrupted publication supports resume. Remote clients and deployed sites do not gain import controls.

Notes:
2026-11-16: User authorized one-shot MVP in the agent session. Branch feat/local-start-import; record docs/plans/local_start_import/local_start_import_one_shot.md. Related PF-20261111-F09 performance and PF-20261104-B14 archive availability remain separate. No deployment or production acceptance yet.
2026-11-16: Fresh-checkout browser flow, all offered themes at phone/desktop sizes, native JS-on/off import failure and retry passed. HTTP checks verified journal resume, duplicate-free repeat and conflicts. Review, merge and deployment remain pending. Smoke: 482/486; four failures reproduced on origin/main. Full suite not run.
2026-11-16: Implementation 817332da pushed; PR https://github.com/gulkily/v3/pull/284 open. Reply to the supplied local thread is pending because discovery and /api/version timed out. No post operation was created.
2026-11-17: Distinct intake after a concurrent ID collision: the unmerged local-start branch used PF-20261116-F01, which main independently assigned to import cancellation. Main retains its cancellation item unchanged. Earlier local-start text and commit trailers remain in PR #284 Git history; this intake identifies the local-start outcome going forward. Integration repair: docs/plans/local_start_import_pr_fix/local_start_import_pr_fix_one_shot.md.
2026-11-17: PR #284 integrated with origin/main 936c6357. Both importer interfaces, resume/retry and tour checks passed; smoke 522/526 with all four failures reproduced unchanged on current main. Fresh-start browser check passed. Review, merge and production acceptance remain pending; full suite not run.
2026-11-22: PR #284 is merged. The import card's progress display is tracked separately as PF-20261122-F01 (PR #357). Maintainer acceptance of the start page itself is not recorded here.
2026-11-24: Completion reconciliation authorized by the maintainer after PR #404. Implementation 817332dadb is on audited main and deployed ancestry (live c4205ea43d). Local page/import shipped in #284 and later worker/progress integration. Existing local browser recovery record and current import-progress tests support the implementation, not the maintainer environment. No new site import was run. Current next action: Maintainer: launch the fetched code on your own machine, explore the local page, and open imported threads through ordinary navigation. Reconciliation: docs/feedback/triage/2026-11-24_completion_applied.txt.