ID: PF-20261123-F01 Title: Backlog page: sort the open items and start work on one or several Kind: feature Workflow: done Created: 2026-11-23 Evidence: deployed Estimate: 0.60 Request: "I want to see a view of things to work on, sortable, and allowing me to start work right away on any one item or possibly multiple items." Refined by the maintainer: a human interface and an agent interface; start means a short copyable prompt that assumes the agent has the repository and points at files, and it also means a claim; several related items can be started together as one cycle; anyone can see the page; it lives under Tools for now; at least five sorts (time entered, time touched, estimated effort, estimated impact, and a combined most-salient order), each newest or oldest first; triage is a filter; parked plans are shown separately; a command line and an API as well as the page. Sources: - Session: Claude chat with the maintainer, 2026-11-23 Done when: With the Backlog flag on at zenmemes.com, the maintainer opens Tools → Backlog on his phone, sorts and filters, ticks two items, presses Start, copies the prompt, and an agent given only that prompt opens a pull request covering both. An agent gets the same list and prompt from /backlog.txt, /backlog/start.txt and ./v3 feedback list and start. Notes: 2026-11-23: staged cycle on feat/backlog_view (docs/plans/backlog_view/), the first of three tracked in docs/plans/backlog_checklist.md. This cycle: the page, five sorts, filters, the Impact header, Start with a short prompt, the text routes, the commands and docs/agents/backlog_to_pr.md. Not in this cycle: claims (next cycle backlog_claims) and the parked plans list (backlog_parked). Verified locally with page tests and a browser check in every permitted theme at 375 and 1280 px, scripts on and off. Not done: a real start by a fresh agent, and the maintainer's own start from his phone. Blocked on review, merge, a deploy with FORUM_BACKLOG_ENABLED on, and that start. 2026-11-23: PR https://github.com/gulkily/v3/pull/377 opened. 2026-11-23: PR #377 merged and deployed with FORUM_BACKLOG_ENABLED on. The maintainer tried it on desktop and iPhone: sorts, Start and Copy work. His notes went into a follow-up one-shot (docs/plans/backlog_start_followups/): an opaque Start bar in Arena and other see-through themes, an Agent decides mode as the default, and "Please" in the prompt. Still blocked on the Done when start: an agent given only the prompt opening a pull request. 2026-11-23: follow-up PR https://github.com/gulkily/v3/pull/379 opened. 2026-11-23: PR #379 merged and deployed (version cdc8abf4683c). The maintainer started PF-20261104-B18 and PF-20261104-B12 together by hand with that prompt; outcome pending, so still blocked on the Done when start. From his notes while doing it, a second follow-up one-shot (docs/plans/backlog_prompt_access/): the prompt asks for a clone and a pull request instead of patch files, and for a word before building items that do not belong together. 2026-11-23: follow-up PR https://github.com/gulkily/v3/pull/381 opened. 2026-11-24: Completion reconciliation authorized by the maintainer after PR #404. Implementation 7289d86c97 is on audited main and deployed ancestry (live c4205ea43d). The exact two-item Start request is preserved in word97_action_fonts_one_shot.md and its resulting PR #380 exists and is merged. Item notes already record the maintainer phone Start/Copy acceptance. Live text backlog and current feedback CLI tests pass. #381 preserves clone/PR wording. Done when/request is satisfied by the checked evidence; prior merge/deployment-only blockers are historical. Reconciliation: docs/feedback/triage/2026-11-24_completion_applied.txt.